MAKING THE MOST OF THE GOOD WEATHER

Plywood bracing panels in the toilet walls with the  start of the disabled ramp on the left.

Decking beams painted for long term protection – the deck runs from the new front entrance past the toilet hallway to the disabled ramp.

 Cladding the kitchen wall on the north side of the hall. The plastic sheeting covers the window frames to protect them from rain while being painted.

Window frame protection, painting by Al Scott and friends.

A rare view, looking through the north wall.

Trusses for the kitchen and toilet roof.

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s