SMOOTH SAILING

Replacing damaged wall studs – all foyer flooring structural timber has been replaced.

The old wall boards are being held at the rear of the property.

The concrete slab for the future under stage storage area, with the toilet hallway floor beams visible on the top left and the rear side of the front of the stage on the right.

Wall construction at the junction of the top of the rear kitchen window and  kitchen outside door.

 

This entry was posted in Uncategorized. Bookmark the permalink.

1 Response to

  1. sophie's avatar sophie says:

    Impressive progresses, well done!

Leave a comment