SOME RE-ORGANIZING DOWNSTAIRS
Because of the need for more storage room for the hall’s equipment, the under stage storage area is being re-organized
Above, windows, doors and other materials replaced during the hall’s renovation were stored under the stage, now they have to go
THE PLAN
Much equipment has been acquired for the running of our Motorcycle Show and Shine event, At present it is temporally stored in the fire shed but needs a permanent home
The origional hall windows are looking for a new home
Condition (they are 100 years old), seven are ok, seven are poor and six badly aged
The origional front doors need a home too
They are in good condition, solid hardwood construction
Two softwood planks, one 350 x 20 x 5 m long and the other 300 x 20 x 3 m long (approx)
Both have a split along the grain in the middle of each plank, apart from this defect, they are in good condition
Last week’s wedding
.
Two fans have been fitted to the hall’s stage
Not much natural air movement on the stage
These fungi came up in a pot during the recent rain, never seen them before
Leucocoprinus birnbaumii
Claimed to be common, usually a result of spores in potting mix, considered inedible
.
PLEASE NOTE
We will no longer have advertising over which we had no control appearing on the blog. We have upgraded our WordPress plan to change our domain name to “obiobihall.blog” which will make our website more accessible to internet search engines. The new plan costing $60.00 annually also removes the advertising. Prior to this our blog was free.