MOVING ALONG AT A BRISK RATE
The start of the toilet and kitchen extension, and in front of that, the footing stirrups for the disabled ramp.
Repairing the existing south side wall and fitting of extended eaves.
The old side door corner, soon to become the main entrance.
Because of its southern aspect, this wall and corner required the most repair.
Northern side wall with its new wooden external stumps.
The front wall looking up at part the steel portal frame which extends the full width of the hall and down to the footings, with two beams up high bracing each side of the portal frame to the stage wall
Where the portal frame meets the side wall.