PROGRESS AGAIN

The interior of the hall remained dry after even though there was 300 mm of rain on the previous weekend.

The rear of the hall from the kitchen end.

More painting of exposed hardwood prior to erection.

Stained windows ready for fitting.

Hardwood was chosen for the door surrounds to match the external hardwood cladding.

Part of the very strong disabled ramp. All supporting beams have been treated with linseed oil.

Detail of the front scaffolding.

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s