THE ROOF IS ON

The rear of the hall looking at the kitchen side.


The framework for the rest of the roof with half of the second painting coat done.

Accumulated rat nest residue in the wall at the rear of the stage

Electricial wiring being installed inside the portal frame which will be covered by a timber cladding. Viewed at the junction of roof and front wall on north side of hall.

Scaffolding moved to the rear to enable the fitting of the roof.

Another weekend of painting and cleanup

Halfway through the second painting, evidenced by the colour change above the window.

Detail of the junction of the rear cladding of the foyer and the front wall with the wall or right side brushed and painted.


Taken from the ceiling above the stage, three buckets of  a combination of rat droppings, grass and straw.

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s