THE HALL’S CENTENARY EVENT IS GETTING CLOSER

Our advertising poster

ObiObiHallPoster 2013

The organization of the Centenary is coming together

.

A Wedding in the vintage style

DSC_85201

.

OBI OBI RD SLIP REPAIRS

Drainage beside the concrete pad.

pad drain

The concrete pad is anchored by rods extending down into the rock shelf below.

.

Working on the tight corner below the repaired slip area

DSC_84751

.

Progress on the Obi Obi down Road.

DSC_84701

A concrete pad now covers the slipped section.

.

Another successful event

DSC_82101

.

A safer fire circle

DSC_85271

.

Placing the rocks

DSC_81811

.

John Cutmore moved the remainder of the donated rocks to the fire circle

DSC_81721

.

Excess top soil from the fire shed site was used to extend the level perimeter of the fire circle.

DSC_81681

.

The finished fire shed pad, improved drainage and flatter parking area.

DSC_85331

.

Drainage work around the parking area was donated by Will McDonald.

DSC_81831

.

Reducing the bumps in the parking area

DSC_81821

.

Laying and compacting the roadbase for the fire shed pad

DSC_81701

Earthworks by Bernie & Leslie Porter of Witta

.

THE START OF THE BUILDING OF THE FIRE SHED

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s