BEFORE THE RAIN

The scaffolding, a complex construction, took some time to erect by  scaffolding specialists.

The north wall re-clad.

The front deck looking from the new hall front door.

The toilet hallway looking from the kitchen end, constructed with same decking boards as the rest of the external flooring.

The disabled ramp from the kitchen end.

Posted in Uncategorized | 1 Comment

SMOOTH SAILING

Replacing damaged wall studs – all foyer flooring structural timber has been replaced.

The old wall boards are being held at the rear of the property.

The concrete slab for the future under stage storage area, with the toilet hallway floor beams visible on the top left and the rear side of the front of the stage on the right.

Wall construction at the junction of the top of the rear kitchen window and  kitchen outside door.

 

Posted in Uncategorized | 1 Comment

MAKING THE MOST OF THE GOOD WEATHER

Plywood bracing panels in the toilet walls with the  start of the disabled ramp on the left.

Decking beams painted for long term protection – the deck runs from the new front entrance past the toilet hallway to the disabled ramp.

 Cladding the kitchen wall on the north side of the hall. The plastic sheeting covers the window frames to protect them from rain while being painted.

Window frame protection, painting by Al Scott and friends.

A rare view, looking through the north wall.

Trusses for the kitchen and toilet roof.

Posted in Uncategorized | Leave a comment