PROGRESS AGAIN

The interior of the hall remained dry after even though there was 300 mm of rain on the previous weekend.

The rear of the hall from the kitchen end.

More painting of exposed hardwood prior to erection.

Stained windows ready for fitting.

Hardwood was chosen for the door surrounds to match the external hardwood cladding.

Part of the very strong disabled ramp. All supporting beams have been treated with linseed oil.

Detail of the front scaffolding.

Posted in Uncategorized | Leave a comment

BEFORE THE RAIN

The scaffolding, a complex construction, took some time to erect by  scaffolding specialists.

The north wall re-clad.

The front deck looking from the new hall front door.

The toilet hallway looking from the kitchen end, constructed with same decking boards as the rest of the external flooring.

The disabled ramp from the kitchen end.

Posted in Uncategorized | 1 Comment

SMOOTH SAILING

Replacing damaged wall studs – all foyer flooring structural timber has been replaced.

The old wall boards are being held at the rear of the property.

The concrete slab for the future under stage storage area, with the toilet hallway floor beams visible on the top left and the rear side of the front of the stage on the right.

Wall construction at the junction of the top of the rear kitchen window and  kitchen outside door.

 

Posted in Uncategorized | 1 Comment