FINE WEATHER, UNINTERRUPTED PROGRESS.
An earlier photo of inside the hall showing the scaffolding erected to allow the replacement of damaged roof rafters.
Spreading of roadbase over a very wet area at the rear of the hall to give access for the installation of the septic and water tanks.
Earth was removed to allow water to escape from the wet area at the rear of the hall. The white water pipes draining roof water indicate the eventual position of the two water tanks that will be placed beside the hall.
A new decking board floor in the completely re-built side entry.
The first completed window
More progress on the new front stairs.
The last of the external cladding. The front deck wall with the toilet doorway at the rear.
Most of the new timber used in the hall restoration is prepared on this saw bench.