.

The toilets

 

Almost completed lining on the toilet hallway.

 

Part of the plaster’s equipment.

Looking from the kitchen towards the hall interior with the start of the new stairway to the stage area beside the hall doorway. The access was origionally from inside the hall.

The now lined kitchen from the hall end.

A used stainless sink, associated shelving and cupboards for use in the hall kitchen have been made available through Bob Dyer.

The rear of the hall with the external entry to the kitchen on the left.

The kitchen stairs.

Front stairs.

Because the new windows were constructed in the same style as the origional windows, older style lock fittings have been used.

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s