.
The toilets
Almost completed lining on the toilet hallway.
Part of the plaster’s equipment.
Looking from the kitchen towards the hall interior with the start of the new stairway to the stage area beside the hall doorway. The access was origionally from inside the hall.
The now lined kitchen from the hall end.
A used stainless sink, associated shelving and cupboards for use in the hall kitchen have been made available through Bob Dyer.
The rear of the hall with the external entry to the kitchen on the left.
The kitchen stairs.
Front stairs.
Because the new windows were constructed in the same style as the origional windows, older style lock fittings have been used.