Except for external light fittings, the completed rear of the hall.
The pad for the water tanks, origionally planned with a concrete base but with our reduced renovation budget, now a wooden frame with crusher dust – at the rear of the pad is the septic tank.
The balustrade is constructed of hardwood timber rails and posts with stainless steel wire.
The completed stairs from the kitchen to the stage area.