.

Still a working interior. The portal frames have been completely enclosed with timber

The kitchen, now with a vinyl floor and hall  door

Vinyl floor covering in the toilets.

 Front door and foyer, the electricial cables are ready for the return of the meter box back to its origional place.

Main dooras a safety precaution,all the external doors open outwards with a  locking system using panic bars required for the main door.

Interesting?

The electricial wiring at the hall has been  re-configured to suit modern power requirements, with wiring and timber supports  provided  for the future installation of  ceiling  fans .

The Association has been given some  chairs, used but in good condition.

Lots of chairs, courtesy of Bob Dyer.

The kitchen with the internal lining finished and painted, looking from the hall door.

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s