Author Archives: kidobi

THE ROOF IS ON The rear of the hall looking at the kitchen side. The framework for the rest of the roof with half of the second painting coat done. Accumulated rat nest residue in the wall at the rear … Continue reading

Posted in Uncategorized | Leave a comment

  5.30 pm Monday with half of the roof on. The start of the new roof over the stage. One of the plumbers. 8.30 am on Monday The third painting and clean-up working bee. To reduce costs the painting of … Continue reading

Posted in Uncategorized | Leave a comment

Ready for the anticipated rain. Before Working on the roof, with various rafters and batterns replaced. Along the ridge line Front barge board end detail, the underside of the eaves which will be lined with decking boards. The existing roof, … Continue reading

Posted in Uncategorized | Leave a comment