Author Archives: kidobi

PROGRESS AGAIN The interior of the hall remained dry after even though there was 300 mm of rain on the previous weekend. The rear of the hall from the kitchen end. More painting of exposed hardwood prior to erection. Stained … Continue reading

Posted in Uncategorized | Leave a comment

BEFORE THE RAIN The scaffolding, a complex construction, took some time to erect by  scaffolding specialists. The north wall re-clad. The front deck looking from the new hall front door. The toilet hallway looking from the kitchen end, constructed with … Continue reading

Posted in Uncategorized | 1 Comment

SMOOTH SAILING Replacing damaged wall studs – all foyer flooring structural timber has been replaced. The old wall boards are being held at the rear of the property. The concrete slab for the future under stage storage area, with the … Continue reading

Posted in Uncategorized | 1 Comment