



Pages
Recent Comments
Caitlin on … -
Join 23 other subscribers
Obi Obi & Kidaman Creek Communities
Author Archives: kidobi
MAKING THE MOST OF THE GOOD WEATHER Plywood bracing panels in the toilet walls with the start of the disabled ramp on the left. Decking beams painted for long term protection – the deck runs from the new front entrance … Continue reading
Posted in Uncategorized
Leave a comment
RAIN and lots of it, so work has stopped. Weather protection fitted by the Building Committee. Prior to the rain The start of the hallway to the kitchen. To the left, the disabled ramp posts and the start of … Continue reading
Posted in Uncategorized
1 Comment
MOVING ALONG AT A BRISK RATE The start of the toilet and kitchen extension, and in front of that, the footing stirrups for the disabled ramp. Repairing the existing south side wall and fitting of extended eaves. The old … Continue reading
Posted in Uncategorized
Leave a comment