



Pages
Recent Comments
Caitlin on … -
Join 23 other subscribers
Obi Obi & Kidaman Creek Communities
Author Archives: kidobi
BEFORE THE RAIN The scaffolding, a complex construction, took some time to erect by scaffolding specialists. The north wall re-clad. The front deck looking from the new hall front door. The toilet hallway looking from the kitchen end, constructed with … Continue reading
Posted in Uncategorized
1 Comment
SMOOTH SAILING Replacing damaged wall studs – all foyer flooring structural timber has been replaced. The old wall boards are being held at the rear of the property. The concrete slab for the future under stage storage area, with the … Continue reading
Posted in Uncategorized
1 Comment
MAKING THE MOST OF THE GOOD WEATHER Plywood bracing panels in the toilet walls with the start of the disabled ramp on the left. Decking beams painted for long term protection – the deck runs from the new front entrance … Continue reading
Posted in Uncategorized
Leave a comment