Author Archives: kidobi

RAIN and lots of it, so work has stopped. Weather protection fitted by the Building Committee. Prior to the rain The start of the hallway to the kitchen.   To the left, the disabled ramp posts and the start of … Continue reading

Posted in Uncategorized | 1 Comment

MOVING ALONG AT A BRISK RATE   The start of the toilet and kitchen extension, and in front of that, the footing stirrups for the disabled ramp. Repairing the existing south side wall and fitting of extended eaves. The old … Continue reading

Posted in Uncategorized | Leave a comment

AT LAST Something is happening at the hall. Above, our Builder, Murray Pearson (on left) with the re-stumper Mick Bielby kneeling. Murray is from Maleny, has met the expectations of the Management Committee, and shown himself to be equal to the … Continue reading

Posted in Uncategorized | Leave a comment